aboutsummaryrefslogtreecommitdiffstats
path: root/guides/source/active_support_core_extensions.md
diff options
context:
space:
mode:
authorgregolsen <anotheroneman@yahoo.com>2012-09-22 23:28:18 +0300
committergregolsen <anotheroneman@yahoo.com>2012-09-22 23:28:18 +0300
commitf912437dd2ca1996a73d6bcf8196c54ce3b62978 (patch)
treed799c6425bb91342f7957009586dc38f74e991c9 /guides/source/active_support_core_extensions.md
parent19fa8fa3c436ed5b25e7ed0005f128487a7d1f0b (diff)
downloadrails-f912437dd2ca1996a73d6bcf8196c54ce3b62978.tar.gz
rails-f912437dd2ca1996a73d6bcf8196c54ce3b62978.tar.bz2
rails-f912437dd2ca1996a73d6bcf8196c54ce3b62978.zip
active support core extensions guides updated with config.beginning_of_week info
Diffstat (limited to 'guides/source/active_support_core_extensions.md')
-rw-r--r--guides/source/active_support_core_extensions.md8
1 files changed, 6 insertions, 2 deletions
diff --git a/guides/source/active_support_core_extensions.md b/guides/source/active_support_core_extensions.md
index 2a84242b9c..1948cb0278 100644
--- a/guides/source/active_support_core_extensions.md
+++ b/guides/source/active_support_core_extensions.md
@@ -3097,7 +3097,8 @@ Time.local(2000, 11, 31).next_quarter # => Wed, 28 Feb 2001
The methods `beginning_of_week` and `end_of_week` return the dates for the
beginning and end of the week, respectively. Weeks are assumed to start on
-Monday, but that can be changed passing an argument.
+Monday, but that can be changed passing an argument, setting thread local
+`Date.beginning_of_week` or `config.beginning_of_week`.
```ruby
d = Date.new(2010, 5, 8) # => Sat, 08 May 2010
@@ -3122,7 +3123,7 @@ d.sunday # => Sun, 09 May 2010
##### `prev_week`, `next_week`
-The method `next_week` receives a symbol with a day name in English (in lowercase, default is `:monday`) and it returns the date corresponding to that day:
+The method `next_week` receives a symbol with a day name in English (default is `Date.beginning_of_week` or :monday if not set) and it returns the date corresponding to that day.
```ruby
d = Date.new(2010, 5, 9) # => Sun, 09 May 2010
@@ -3139,6 +3140,7 @@ d.prev_week(:friday) # => Fri, 30 Apr 2010
```
`prev_week` is aliased to `last_week`.
+Both `next_week` and `prev_week` work as expected when Date.beginning_of_week` or `config.beginning_of_week` is set.
##### `beginning_of_month`, `end_of_month`
@@ -3617,6 +3619,8 @@ now = Time.current
# => Mon, 09 Aug 2010 23:20:05 UTC +00:00
now.all_week
# => Mon, 09 Aug 2010 00:00:00 UTC +00:00..Sun, 15 Aug 2010 23:59:59 UTC +00:00
+now.all_week(:sunday)
+# => Sun, 16 Sep 2012 00:00:00 UTC +00:00..Sat, 22 Sep 2012 23:59:59 UTC +00:00
now.all_month
# => Sat, 01 Aug 2010 00:00:00 UTC +00:00..Tue, 31 Aug 2010 23:59:59 UTC +00:00
now.all_quarter